I’m considering a 250 m² duplex in Rotterdam at €708,400 and testing a preliminary renovation allowance of €126,500. The scope is kitchen, bathrooms, flooring, paint, electrical checks and moderate energy upgrades, with no extension planned. I’m less worried about finish choices than sequencing and hidden conditions. What contingency would people carry, and which survey or contractor questions would expose the biggest risks before committing?