The items I cannot safely postpone are wiring, leaks and waterproofing; finishes can wait. With that priority, I’m reviewing a preliminary S$197,300 budget for renovating a 205 m², five-bedroom villa in Singapore.
The scope includes the kitchen, bathrooms, floors, painting, electrical checks and some energy-efficiency work, but no extension. I’m concerned that the electrical allowance covers inspection without necessary rewiring, or that access and making good are excluded from the plumbing price.
What would you ring-fence for discoveries behind walls and ceilings? I’d also appreciate suggestions for questions about contractor exclusions, permit lead times and which areas are worth opening before the main contract is signed.
The scope includes the kitchen, bathrooms, floors, painting, electrical checks and some energy-efficiency work, but no extension. I’m concerned that the electrical allowance covers inspection without necessary rewiring, or that access and making good are excluded from the plumbing price.
What would you ring-fence for discoveries behind walls and ceilings? I’d also appreciate suggestions for questions about contractor exclusions, permit lead times and which areas are worth opening before the main contract is signed.