The seller is asking AED 4,606,000, and I am unsure how far the 99 days on market and required updating have weakened that position. Nearby listings support the general range, but there are too few completed transactions for me to rely confidently on their asking figures.
I am considering AED 4,375,700, which is 5% lower, supported by financing proof and some flexibility over completion. I would keep the price explanation short and tied to condition and the limited closed-sale evidence. Rather than remove inspection, financing or appraisal protection, I would prefer to discuss repair credits if the inspection reveals material work.
What should I verify before submitting, particularly about any earlier offer and the seller’s preferred timing? I also want to understand when the deposit becomes exposed if a condition cannot be satisfied, rather than trading away protection merely to make the opening price look stronger.
I am considering AED 4,375,700, which is 5% lower, supported by financing proof and some flexibility over completion. I would keep the price explanation short and tied to condition and the limited closed-sale evidence. Rather than remove inspection, financing or appraisal protection, I would prefer to discuss repair credits if the inspection reveals material work.
What should I verify before submitting, particularly about any earlier offer and the seller’s preferred timing? I also want to understand when the deposit becomes exposed if a condition cannot be satisfied, rather than trading away protection merely to make the opening price look stronger.