Offer too little and the seller may stop engaging; offer too much and I lose the benefit of the flat’s 100 days on the market. The Tokyo new-build one-bedroom is listed at ¥211,900,000, and some items will need attention. Current listings nearby support the asking level, but the evidence from actual transactions is thin.
I’m considering starting 8% lower, around ¥194.95m, backed by clean financing and flexibility over completion. Is that firm enough to be credible without giving away room to negotiate? I’d keep the explanation brief and retain only the protections that matter for financing, valuation, inspection and the deposit. I’m also unsure what response deadline would be reasonable.
I’m considering starting 8% lower, around ¥194.95m, backed by clean financing and flexibility over completion. Is that firm enough to be credible without giving away room to negotiate? I’d keep the explanation brief and retain only the protections that matter for financing, valuation, inspection and the deposit. I’m also unsure what response deadline would be reasonable.