Before taking the warehouse further, I have to establish whether the AED 429,600 renovation allowance can survive an older building with concealed defects. The choice is between defining more of the work before appointment and preserving a substantial reserve for discoveries after opening up.
The 85 m² scheme adds kitchen and bathroom areas, renews finishes, tests the electrics and includes some energy improvements, but no extension. Accessible plumbing and sound drainage would keep that scope manageable. Difficult runs, moisture, old wiring or structural repairs could instead require extensive floor and wall work and disrupt the whole sequence.
What would you insist the surveys and tenders resolve before committing? I am also trying to size the contingency without ignoring permit timing and material lead times. If the services and structure can be properly investigated now, I would expect a tighter reserve; if access prevents that, more of the AED 429,600 needs to remain outside the main contract.
The 85 m² scheme adds kitchen and bathroom areas, renews finishes, tests the electrics and includes some energy improvements, but no extension. Accessible plumbing and sound drainage would keep that scope manageable. Difficult runs, moisture, old wiring or structural repairs could instead require extensive floor and wall work and disrupt the whole sequence.
What would you insist the surveys and tenders resolve before committing? I am also trying to size the contingency without ignoring permit timing and material lead times. If the services and structure can be properly investigated now, I would expect a tighter reserve; if access prevents that, more of the AED 429,600 needs to remain outside the main contract.