From the contractor side, I never let an allowance read as a fixed price. It stays a separate line, with what it covers, what finding could move it, and the range of plausible outcomes — with evidence for the range, not a guessed percentage.
That is also how the two estimates become comparable: same scope, same allowance treatment, then the difference is in the real work, not in who hid the unknown better.
And I agree on the next step: name what would narrow it — access to the area, a closer look, or a more detailed scope — and get that done before signing, not after.
What is the allowance that most often catches people out in your deals — the hidden repair, or the finish choice?