Standardize the small hardware in every turn

The small parts are what slow a turn down: a hinge that does not match, a door stop missing, a strike plate in a different finish, a toilet seat that wobbles, a blind wand that is gone. None of it is hard. It is just different in every unit, so the crew guesses and makes another parts run.

What works for us: pick one hinge, one door stop, one strike plate, one toilet seat, and one blind wand, and use them across the building. The crew carries one small-parts kit instead of a box of maybe-fits. Callbacks drop because the next person to open that door already knows what is on it.

What do you standardize across your units, and what is still different every time?
 
Back
Top