One approach is to add a generous contingency to every quote; the other is to investigate first and tighten the allowance as the unknowns disappear. I am unsure which is more sensible for a 170 m² Zurich apartment where the preliminary total is CHF 341,100.
The renovation includes new work to the kitchen and wet rooms, replacement finishes, decoration, an electrical review and some energy-related improvements. There is no planned extension. Contractors have omitted different things, however, so their totals are not directly comparable.
Before choosing finishes, I want to establish plumbing access, moisture conditions, the true electrical scope, required approvals and any materials with long lead times. Which building plans, surveys or written exclusions would you insist on seeing before setting the contingency and programme?
The renovation includes new work to the kitchen and wet rooms, replacement finishes, decoration, an electrical review and some energy-related improvements. There is no planned extension. Contractors have omitted different things, however, so their totals are not directly comparable.
Before choosing finishes, I want to establish plumbing access, moisture conditions, the true electrical scope, required approvals and any materials with long lead times. Which building plans, surveys or written exclusions would you insist on seeing before setting the contingency and programme?