I do not want to lock the scope before the expensive unknowns have been opened up. The project is a 2,580 sq ft Manchester warehouse, and the preliminary renovation allowance is £297,500. There is no extension, but the plan includes new kitchen and bathroom areas, replacement finishes, electrical work and some energy improvements.
The finish choices can be adjusted later. Moisture entry, drainage routes, the condition of existing services and the true electrical scope could instead force changes to the order of work. Material lead times may also matter if key items must be chosen before those investigations are complete.
What should the surveyor investigate first, and how much contingency would you retain until contractors have priced those findings?
The finish choices can be adjusted later. Moisture entry, drainage routes, the condition of existing services and the true electrical scope could instead force changes to the order of work. Material lead times may also matter if key items must be chosen before those investigations are complete.
What should the surveyor investigate first, and how much contingency would you retain until contractors have priced those findings?