The R$1,422,000 draft budget looks workable on paper, but permit timing is my immediate concern. This is for a 205 m² warehouse renovation in Rio covering a kitchen, bathrooms, floors, painting, electrical investigation and moderate energy improvements, without adding floor space.
The wet areas may not remain beside the existing service points, so plumbing access and drainage could affect both cost and sequence. What level of contingency would you retain before opening up, and what should each contractor be required to state about exclusions and provisional sums? I also want to identify any approvals and lead times that could delay the programme rather than simply add a larger buffer.
The wet areas may not remain beside the existing service points, so plumbing access and drainage could affect both cost and sequence. What level of contingency would you retain before opening up, and what should each contractor be required to state about exclusions and provisional sums? I also want to identify any approvals and lead times that could delay the programme rather than simply add a larger buffer.