Recent content by WorthyTable

  1. W

    Closing credit or price reduction for ARS 29.4m of inspection items?

    The seller wants to organise the repairs, and I am hesitant because I would have little control over the contractors or final standard. The inspection of this 120 m² Buenos Aires new-build flat identified manageable items estimated at roughly ARS 29,400,000. I am considering either a credit at...
  2. W

    Which property workflow integration actually removed duplicate work?

    For the trial, use a small set of real but suitably controlled records and assign the same tasks to the people who actually receive each handoff. Record duplicate fields, clicks needed on mobile, missing context, permission problems and document-version confusion. Then disable any optional...
Back
Top